Mission type | Lunar orbiter and Impactor |
---|---|
Operator | ISRO |
COSPAR ID | 2008-052A |
SATCAT no. | 33405 |
Website | www |
Mission duration | Planned: 2 years Final: 10 months, 6 days |
Spacecraft properties | |
Manufacturer | ISRO |
Launch mass | 1,380 kg (3,040 lb)[1] |
Dry mass | 560 kg (1,230 lb)[2] |
Payload mass | 105 kg (231 lb)[2] |
Start of mission | |
Launch date | 22 October 2008, 00:52 (2008-10-22UTC00:52) UTC |
Rocket | PSLV-XL C11[3][4] |
Launch site | Satish Dhawan Space Centre |
Contractor | ISRO |
End of mission | |
Last contact | 28 August 2009, 20:00 (2009-08-28UTC21) UTC |
Orbital parameters | |
Reference system | Selenocentric |
Semi-major axis | 1,758 kilometers (1,092 mi) |
Eccentricity | 0.0 |
Periselene altitude | 200 km (120 mi) |
Aposelene altitude | 200 km (120 mi) |
Epoch | 19 May 2009 |
Lunar orbiter | |
Orbital insertion | 8 November 2008 |
Orbits | 3,400 at EOM[5] |
Mission type | Lunar orbiter and Impactor |
---|---|
Operator | ISRO |
COSPAR ID | 2008-052A |
SATCAT no. | 33405 |
Website | www |
Mission duration | Planned: 2 years Final: 10 months, 6 days |
Spacecraft properties | |
Manufacturer | ISRO |
Launch mass | 1,380 kg (3,040 lb)[1] |
Dry mass | 560 kg (1,230 lb)[2] |
Payload mass | 105 kg (231 lb)[2] |
Start of mission | |
Launch date | 22 October 2008, 00:52 (2008-10-22UTC00:52) UTC |
Rocket | PSLV-XL C11[3][4] |
Launch site | Satish Dhawan Space Centre |
Contractor | ISRO |
End of mission | |
Last contact | 28 August 2009, 20:00 (2009-08-28UTC21) UTC |
Orbital parameters | |
Reference system | Selenocentric |
Semi-major axis | 1,758 kilometers (1,092 mi) |
Eccentricity | 0.0 |
Periselene altitude | 200 km (120 mi) |
Aposelene altitude | 200 km (120 mi) |
Epoch | 19 May 2009 |
Lunar orbiter | |
Orbital insertion | 8 November 2008 |
Orbits | 3,400 at EOM[5] |